# Go-Live Checklist

The gate every department passes before its Clones go live, covering readiness, security, people, comms and rollback in one signed checklist.

## What this is for

A go-live is the moment a Clone stops being a pilot and starts doing real work for a whole department. Most failed rollouts fail here: a connection nobody re-checked, a team that never heard the announcement, or no plan for what happens if something goes wrong on day two. This checklist makes launch a deliberate decision with named owners, not a date on a calendar.

## When to use it

Once per department, during the Launch stage of the six-week rollout cycle, after the pilot scorecard shows accuracy and adoption above threshold. Re-run it whenever a live Clone gets a new connection, a new channel or a new skill that touches production data.

## Who's involved

- **Implementation Engineer** completes the technical sections.
- **Change & Enablement Lead** and the department **Champion** complete the people and comms sections.
- **InfoSec lead** confirms security items and signs.
- **Business owner** makes the go / no-go call and signs.

## How to fill it in

1. Copy the template into the department's workspace in the portal. The Project Clone pre-fills Clone names, skills and connections from the Clone Design Spec.
2. Work through each section. Every item needs an owner and evidence (a link, a screenshot or a test result), not just a tick.
3. Mark any item that cannot be met as a **blocker** or an **accepted exception**. Exceptions need a named owner and a date.
4. Hold a 45-minute go / no-go review with the business owner, InfoSec lead, Champion and Implementation Engineer.
5. Record the decision. On "go", the Project Clone opens the hypercare log and schedules the day-7 and day-30 checks.

## The template

### Launch summary

| Field | Entry |
|---|---|
| Department | _Customer Support_ |
| Business owner | |
| Champion | |
| Clones going live | _Support Triage Clone, Returns Clone_ |
| Starting autonomy level | _Recommend (level 2)_ |
| Users in scope | _62 agents and 4 team leads_ |
| Channels | _Slack, email, Clone Team Studio_ |
| Planned go-live date | |
| Hypercare window | _10 business days_ |
| Pilot scorecard link | /playbook/templates/pilot-scorecard |

### 1. Readiness evidence

- [ ] Department Opportunity Brief approved and linked
- [ ] Clone Design Spec approved, version noted: ______
- [ ] All test scenarios passed (link to test scenario pack results)
- [ ] Pilot accuracy at or above threshold: ____% (threshold ____%)
- [ ] Pilot adoption at or above threshold: ____% of pilot users active weekly
- [ ] Open defects from pilot: none above "minor", or each has an owner and date
- [ ] Baseline metrics captured for every metric on the scorecard

### 2. Clone configuration

| Item | Clone | Status | Evidence | Owner |
|---|---|---|---|---|
| Role and instructions final | _Support Triage Clone_ | _Done_ | _Spec v1.3_ | _Implementation Engineer_ |
| Knowledge loaded and current | | | | |
| Skills enabled match the design spec (nothing extra) | | | | |
| Skill versions pinned for production | | | | |
| Schedules set and tested | | | | |
| Approval rules match the autonomy level | | | | |
| Escalation owner set and reachable | | | | |

### 3. Security and access

- [ ] Every connection on the Connections & Permissions Plan is approved by InfoSec
- [ ] Connections use least-privilege scopes; no personal admin tokens in production
- [ ] User access is set by role (who can chat with, configure or administer each Clone)
- [ ] Single sign-on enforced for all users in scope
- [ ] Audit logging confirmed on for every Clone going live; test entry located
- [ ] Data the Clone must never touch is listed in the Governance Charter and tested
- [ ] AI Risk Register updated for this department's use cases

### 4. People and training

- [ ] Champion has completed Champion certification
- [ ] Department role training scheduled or complete: ____% of users trained
- [ ] Team leads briefed on approvals, overrides and how to report a problem
- [ ] Office hours booked for the first two weeks
- [ ] How-to videos for the top three tasks published

### 5. Communications

- [ ] Launch announcement drafted and approved by the sponsor or business owner
- [ ] "Capacity, not replacement" FAQ shared with the department
- [ ] Where to get help is clear: Champion, channel, office hours
- [ ] Launch date shared with adjacent teams who receive handoffs

### 6. Operations and rollback

| Item | Detail | Owner |
|---|---|---|
| Hypercare contact (first 10 days) | | |
| How to pause a Clone | _Business owner or org admin pauses; Implementation Engineer notified_ | |
| How to revoke a connection | | |
| Rollback plan | _Revert to previous pinned skill version; drop to Assist level_ | |
| Incident severity scale agreed | _Per Governance Charter_ | |
| Day-7 check booked | | |
| Day-30 check booked | | |

### 7. Blockers and accepted exceptions

| # | Item | Blocker or exception | Mitigation | Owner | Due |
|---|---|---|---|---|---|
| 1 | _Returns Clone ERP write scope pending_ | _Exception: Returns Clone launches read-only_ | _Write scope reviewed at day 30_ | _IT lead_ | _Day 30_ |

### Go / no-go

| Question | Yes / No |
|---|---|
| Are all blockers closed? | |
| Is every exception owned and dated? | |
| Does the department know it is launching and where to get help? | |
| Can we pause or roll back within one business hour? | |

## Good looks like

- Every tick has evidence behind it. "Done" with no link is not done.
- The starting autonomy level matches what the pilot proved, not what the department hopes for.
- Rollback has been rehearsed once, not just written down.
- Exceptions are rare, named and dated. A list of ten exceptions is a "no-go".
- Adjacent teams are told. Handoff surprises are the most common day-two complaint.
- Common mistake: launching with skills enabled "just in case". Ship only what the design spec approved.

## How Clone helps

The **Project Clone** pre-fills the checklist from the design spec and pilot scorecard, chases owners for missing evidence, and records the decision in the portal, where the department's status moves to "Live". The **GRC Clone** cross-checks connections and audit log status against the Connections & Permissions Plan and flags any gap to the InfoSec lead. The **Enablement Clone** reports training completion for the people section.

## Sign-off

| Role | Name | Date | Decision |
|---|---|---|---|
| Business owner | | | Go / No-go / Go with exceptions |
| InfoSec lead | | | Approved / Not approved |
| Champion | | | Ready / Not ready |
| Implementation Engineer | | | Ready / Not ready |

## Related

- [Pilot Scorecard](/playbook/templates/pilot-scorecard)
- [Clone Design Spec](/playbook/templates/clone-design-spec)
- [Communications Plan](/playbook/templates/communications-plan)
- [Connect accounts and turn on skills](https://support.clone.org/articles/connect-accounts-and-turn-on-skills)
- [Access control and roles](https://support.clone.org/articles/access-control-roles)

---
From the Clone Solutions Playbook: https://solutions.clone.org/playbook/templates/go-live-checklist