# AI Risk Register

A living register of AI risks by use case, scored for likelihood and impact, with controls, owners, autonomy limits and a review cadence.

## What this is for

Every Clone workflow carries risk: a wrong answer, a leaked record, an action taken on stale data. The register makes those risks visible, scores them consistently, and ties each one to a control, an owner and a limit on autonomy. It is how InfoSec decides whether a workflow can be promoted, how steering sees the risk position each month, and how auditors see that risks were managed, not just listed.

## When to use it

Create the register in the Week 3 governance design session. Add risks for every new use case in the Design week of each department rollout. Review open High and Critical risks at the weekly InfoSec sync, the full register monthly for the steering pack, and every risk before an autonomy promotion.

## Who's involved

- **InfoSec lead:** owns the register and the scoring method.
- **Business owners:** own the risks for their departments' use cases and accept residual risk.
- **Implementation Engineer:** proposes technical controls and tests them.
- **GRC Specialist and GRC Clone:** facilitate, maintain, and report.

## How to fill it in

1. For each use case, walk through the risk categories below and ask "how could this go wrong here?"
2. Write each risk as cause → event → consequence. One risk per row.
3. Score inherent risk (before controls) for likelihood and impact.
4. List controls. Mark each as Preventive, Detective or Corrective, and as In place or Planned.
5. Score residual risk (after controls in place).
6. Set the autonomy cap: the highest level this workflow may reach while this risk remains at its residual score.
7. Assign an owner and a review date. Risks above appetite need a treatment plan and a target date.
8. Log incidents and near misses against the relevant risk. Rescore after every incident.

## The template

### Scoring scales

**Likelihood**

| Score | Label | Guide |
|---|---|---|
| 1 | Rare | Not expected in a year of operation |
| 2 | Unlikely | Could happen once a year |
| 3 | Possible | Could happen once a quarter |
| 4 | Likely | Expected monthly |
| 5 | Almost certain | Expected weekly or more |

**Impact**

| Score | Label | Guide |
|---|---|---|
| 1 | Minimal | Internal inconvenience, fixed in minutes |
| 2 | Minor | Internal rework, no external effect |
| 3 | Moderate | Limited customer or financial effect, reversible |
| 4 | Major | Significant financial loss, regulatory notification possible, customer harm |
| 5 | Severe | Regulatory action, material loss, serious harm to people or reputation |

**Rating = Likelihood × Impact**

| Rating | Level | Appetite and action |
|---|---|---|
| 1–4 | Low | Accept; review quarterly |
| 5–9 | Medium | Accept with controls; review monthly |
| 10–16 | High | Treatment plan required; review weekly; autonomy capped at Execute with approval |
| 20–25 | Critical | Do not go live until reduced; steering informed |

### Risk categories (prompt list)

| Category | Prompt questions |
|---|---|
| Accuracy and hallucination | Could the Clone state something false with confidence? Would anyone catch it? |
| Data exposure | Could sensitive data reach the wrong person, channel or system? |
| Unauthorized action | Could the Clone act beyond its approved autonomy level or scope? |
| Prompt injection and manipulation | Could content from an email, document or web page change what the Clone does? |
| Stale or wrong knowledge | Could the Clone rely on an outdated policy, price list or procedure? |
| Bias and fairness | Could outputs treat people differently on protected characteristics? |
| Over-reliance | Will approvers rubber-stamp because the Clone is usually right? |
| Integration failure | What happens if a connected system is down, slow or returns bad data? |
| Regulatory and contractual | Does the use case touch rules on disclosure, consent, record keeping or automated decisions? |
| Third-party and vendor | Does the workflow depend on another AI vendor or tool with its own risks? |
| Adoption and change | Could users bypass the Clone, or misuse it, because of how it was introduced? |
| Cost and capacity | Could usage spike unexpectedly in a way nobody is watching? |

### Register

| ID | Use case / Clone | Category | Risk (cause → event → consequence) | L | I | Inherent | Controls (P/D/C, in place / planned) | L | I | Residual | Autonomy cap | Owner | Treatment plan and date | Status | Last reviewed |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| R-01 | | | | | | | | | | | | | | Open / Treating / Accepted / Closed | |
| _R-12_ | _AP Matching Clone_ | _Accuracy_ | _Invoice with ambiguous PO reference → Clone proposes the wrong PO → overpayment or duplicate payment_ | _3_ | _4_ | _12 High_ | _P: match only on PO + vendor + amount within tolerance (in place). D: approver sees match evidence side by side (in place). D: weekly duplicate-payment report (planned). C: ERP payment hold on variance (in place)_ | _2_ | _3_ | _6 Medium_ | _Execute within limits for variance ≤ 2%; Execute with approval otherwise_ | _Controller_ | _Duplicate report live by Week 9_ | _Treating_ | _wk 7_ |
| _R-13_ | _AP Matching Clone_ | _Prompt injection_ | _Supplier email contains instructions → Clone changes vendor bank details → payment fraud_ | _2_ | _5_ | _10 High_ | _P: Clone has no write scope on vendor master (in place). P: bank detail changes are prohibited in the charter (in place). D: injection test cases in test pack (in place)_ | _1_ | _5_ | _5 Medium_ | _No change to vendor master at any level_ | _InfoSec lead_ | _n/a_ | _Accepted_ | _wk 7_ |

### Incident and near-miss log

| Date | Risk ID | Clone / workflow | What happened | Severity | Caught by (control) | Fix | Autonomy change | Rescored? |
|---|---|---|---|---|---|---|---|---|
| | | | | | | | None / Demoted to ___ | |

### Monthly summary for steering

| Measure | This month | Last month |
|---|---|---|
| Open risks: Critical / High / Medium / Low | | |
| New risks added | | |
| Risks closed or reduced | | |
| Incidents above agreed severity | | |
| Near misses logged | | |
| Workflows demoted | | |
| Treatment plans overdue | | |

### Review checklist (before any autonomy promotion)

- [ ] All risks for the workflow reviewed within the last 30 days
- [ ] No open Critical risk; any High risk has controls in place, not planned
- [ ] Proposed level does not exceed any risk's autonomy cap
- [ ] Incidents since last review logged and rescored
- [ ] Business owner has accepted residual risk in writing

## Good looks like

- **Risks are specific to a use case.** "AI might hallucinate" is a category. "Clone proposes the wrong PO when the reference is ambiguous" is a risk.
- **Controls are tested,** and each test is linked in the Test Scenario Pack.
- **Every risk caps autonomy.** The register drives promotion decisions, not just reporting.
- **Near misses are logged.** They are the cheapest lessons you will get.
- **Residual risk is accepted by a named business owner,** not by the delivery team.
- **Common mistake:** building the register once for the audit and never touching it again. Review it weekly while workflows are changing.

## How Clone helps

The **GRC Clone** drafts risks for each new use case from the Clone Design Spec and the prompt list, reminds owners before review dates, logs incidents from the audit log review, and produces the monthly summary for the steering pack. The **GRC Specialist** chairs the risk discussion at the weekly InfoSec sync. In the portal, the register is the AI Risk Register deliverable under Security & GRC; High and Critical risks surface on the steering dashboard, and promotion requests show the linked risks and their caps.

## Sign-off

| Role | Name | Date | Decision |
|---|---|---|---|
| InfoSec lead | | | Register approved |
| Business owner (per use case) | | | Residual risk accepted |
| Executive sponsor (any Critical risk) | | | Accepted / Not accepted |

## Related

- [Clone Governance Charter](/playbook/templates/clone-governance-charter)
- [Security Configuration Baseline](/playbook/templates/security-configuration-baseline)
- [Test Scenario Pack](/playbook/templates/test-scenario-pack)
- [Autonomy Promotion Evidence Pack](/playbook/templates/autonomy-promotion-evidence-pack)
- [Audit Evidence Pack](/playbook/templates/audit-evidence-pack)

---